Cookies help us deliver our services. By using our services, you agree to our use of cookies. More information

Difference between revisions of "Xtreme Everest 2"

From Bioblast
Line 33: Line 33:


<gallery mode=packed widths="350px" heights="300px" perrow=3>
<gallery mode=packed widths="350px" heights="300px" perrow=3>
Β 
File:Ebc1.jpg
File:Ebc2.jpg
File:Erich EBC.jpg
File:Ebc4.jpg
File:Ebc5.jpg
File:Ebc6.jpg
File:Ebc7.jpg
File:Ebc8.jpg
File:Ebc9.jpg
File:Ebc10.jpg
File:Ebc11.jpg
File:Ebc12.jpg
File:Ebc13.jpg
File:Ebc14.jpg
File:Ebc16.jpg
File:Ebc15.jpg
File:Ebc18.jpg
File:Ebc19.jpg
File:Ebc20.jpg
File:Ebc21.jpg
File:Ebc22.jpg
File:Ebc23.jpg
File:Ebc24.jpg
File:Ebc25.jpg
File:Ebc26.jpg
File:Ebc27.jpg
File:Ebc28.jpg
File:Ebc29.jpg
File:Ebc30.jpg
File:Ebc31.jpg
File:Ebc32.jpg
File:Ebc33.jpg
File:Ebc34.jpg
File:Ebc35.jpg
File:Ebc36.jpg
File:Ebc37.jpg
</gallery>
</gallery>

Revision as of 13:10, 15 May 2015

Template:OROBOROS navigation line page name

O2k-Network

Xtreme Everest 2 - two O2k-Network Labs collaborate in the expedition Xtreme Everest 2 (2013)


General Information

>> http://www.oroboros.at/?Xtreme-Everest2 >> http://www.xtreme-everest.co.uk

High-resolution respirometry in two labs:

  • Kathmandu (KTM): 1,400 m (two O2k; March 03 to 15)
  • Everest Base Camp (EBC): 5,300 m (three O2k; March 14 to May)

Track record

  • 2013-03-01: The teams fly from London and Innsbruck/Munich to Kathmandu (KTM).
  • 2013-03-02: Arrival in KTM, where the equipment is unpacked at Summit Hotel.
  • 2013-03-03: The two O2k are set up in the general lab: Sensor service, sensor test, calibration, instrumental background.
  • 2013-03-04: Alex and James fly to Lucla to start the ascent towards Everest Base Camp (EBC). The first Sherpa volunteers come into the KTM lab. Another series of O2k performance tests.
  • 2013-03-05: Biopsies of two Sherpa volunteers were analyzed with two protocols in the O2k - a successful start of the first functional mitochondrial study in Sherpas.
  • 2013-03-06: The Sherpa biopsies are continued in the KTM lab. Erich flies to Lukla, to catch up with the EBC team.
  • 2013-03-07: Erich meets the EBC team at the Namche laboratory.
  • 2013-03-11: Power cut interrupts second experiment on this day. The team gets a short debrief before the last day of experiments gets started.
  • 2013-03-12: Experiments finished today. Alltogether, 15 muscle biopsies were taken by Prof. David Howard. The KTM-team celebrates the successful run of experiments
  • 2013-03-13: A last run of instrumental background for quality assurance of the data.

Gallery of the Everest Base Camp (5,364 m) - Xtreme Everest 2